
Add to Cart
3KVA 5KVA 10KVA AC Dry Hipot Test Set Indoor Power Distribution Transformer
AC Dry Hipot Tester 3KVA/5KVA/10KVA
Kindly Note:
The capacity and maximum voltage output could be customized according to the requirements of customer if you can not find the right one in the above table.
Function:
Technical Index:
Model |
Max output capacity KVA |
Max high voltage output KV |
Max current in hv circuit MA |
Voltage current input of voltage booster V |
Voltage current input of voltage booster A |
Ratio |
GTB-1.5/50 | 1.5 | 50 | 30 | 200 | 7.5 | 500 |
GTB -3/50 | 3 | 50 | 60 | 200 | 15 | 500 |
GTB-5/50 | 5 | 50 | 100 | 200 | 25 | 500 |
GTB-10/50 | 10 | 50 | 200 | 220/380 | 50/26 | 500 |
GTB -20/50 | 20 | 50 | 400 | 380 | 53 | 500 |
GTB -30/50 | 30 | 50 | 600 | 380 | 79 | 500 |
GTB -40/50 | 40 | 50 | 800 | 380 | 105 | 500 |
GTB -50/50 | 50 | 50 | 1000 | 380 | 132 | 500 |
GTB -5/100 | 5 | 100 | 50 | 200 | 25 | 1000 |
GTB-10/100 | 10 | 100 | 100 | 200/380 | 50/26 | 1000 |
GTB -20/100 | 20 | 100 | 200 | 380 | 53 | 1000 |
GTB -30/100 | 30 | 100 | 300 | 380 | 79 | 1000 |
GTB -40/100 | 40 | 100 | 400 | 380 | 105 | 1000 |
GTB -50/100 | 50 | 100 | 500 | 380 | 132 | 1000 |
GTB -100/100 | 100 | 100 | 100 | 500 | 263 | 1000 |
GTB -150/100 | 150 | 100 | 1500 | 500 | 300 | 1000 |
Power Supply
(1)Voltage: AC220V±10%
(2)Frequency: 45~65Hz
(3)Max current: 45.5A
Environment requirements
(1)Ambient temperature: -10℃~40℃
(2)Relative humidity: ≤80%
Technical parameters
1. Impedance voltage: 4.5%-8%
2. Surface temperature rise: sine wave
3. Idle load loss consumption: 0.2%-0.35%
4. Allowable continuous operation time: 2 hours
5. Interrupted operation time: continuous
Precautions
1. Checking whether the appliance components and contact point have transportation damages and bad contact when opening the box.
2. Before using, strictly checking whether the contact of each appliance is proper, especially for the carbon brush of voltage regulator.
3. Operating in strict accordance with operation procedures.
4. If it will not be used for a long time, it should be placed at dry and corrosion gas free place with air ventilation.